Build: #6 failed

Job: Multiprovider basic was successful

Stages & jobs

  1. Qnthack - copy quarantine

  2. Acceptance Test

  3. Qnthack - rerun

    Final

user switches to oneprovider2 after oneprovider1 has been stopped[1oz 2op deployed]: Test case result

The below summarizes the result of the test " user switches to oneprovider2 after oneprovider1 has been stopped[1oz 2op deployed]" in build 6 of Onedata Products - gui acceptance pkg - feature-VFS-12310-turn-off-acc-tests-reruns-2 - Multiprovider basic.
Description
user switches to oneprovider2 after oneprovider1 has been stopped[1oz 2op deployed]
Test class
gui.scenarios.test_multiprovider_basic
Method
test_user_switches_to_oneprovider2_after_oneprovider1_has_been_stopped[1oz_2op_deployed]
Duration
1 min
Status
Successful