Acceptance tests using different clients concurrently. Environment deployed from packages.
Build: #1916 failed
Job: Permission POSIX was successful
using client2 user sees change of posix permissions an statuschange time after changing permissions using client1 for directory[1oz 1op 1oc-oneclient1-RESt]: Test case result
The below summarizes the result of the test " using client2 user sees change of posix permissions an statuschange time after changing permissions using client1 for directory[1oz 1op 1oc-oneclient1-RESt]" in build 1,916 of Onedata Products - mixed acceptance pkg - Chrome permission POSIX tests.
- Description
- using client2 user sees change of posix permissions an statuschange time after changing permissions using client1 for directory[1oz 1op 1oc-oneclient1-RESt]
- Test class
- mixed.scenarios.test_permission_posix
- Method
- test_using_client2_user_sees_change_of_posix_permissions_an_statuschange_time_after_changing_permissions_using_client1_for_directory[1oz_1op_1oc-oneclient1-REST]
- Duration
- 14 secs
- Status
- Successful