Acceptance tests using different clients concurrently. Environment deployed from packages.
Build: #1891 failed
Job: Access tokens was successful
Test results
- 2 tests in total
- 1 test was fixed
- 9 minutes taken in total.
The following 2 tests have passed: 1 test were fixed since the last build.
Status | Test | Duration |
---|---|---|
test_luma
test_luma_local_feed_storage_mappings_on_posix_storage_for_new_files_are_respected_in_oneclient_interface[1oz_1op_luma_oneclient]
|
4 mins |
- Showing 1-2 of 2