Acceptance tests using different clients concurrently. Environment deployed from packages.

Build: #2509 was successful Changes by Jakub Liput <jakub.liput@gmail.com> and Jakub Liput

Build result summary

Details

Completed
Queue duration
16 minutes
Duration
62 minutes
Labels
None
Revision
e4297773764b689348e4b9165f89a89b96201424
Total tests
430
Successful since
#2508 ()

Tests

  • 0 New failures
  • 0 Existing failures
  • 0 Fixed

Code commits

Author Commit Message Commit date
Jakub Liput Jakub Liput e4297773764b689348e4b9165f89a89b96201424 Merge pull request #569 in VFS/onedata-acceptance from feature/VFS-9606-gui-update-develop to develop
* commit '0578c4bf18b855bb83401fe4542b6025e9289b70':
  VFS-9606 Fixed bamboo-spec
  VFS-9606 Disabled more QoS tests
  VFS-9606 Fixed bamboo-spec
  VFS-9606 Disabled QoS tests
Jakub Liput <jakub.liput@gmail.com> Jakub Liput <jakub.liput@gmail.com> 0578c4bf18b855bb83401fe4542b6025e9289b70 VFS-9606 Fixed bamboo-spec
Jakub Liput <jakub.liput@gmail.com> Jakub Liput <jakub.liput@gmail.com> 2f6b52034a03e93d24c7757ac8ca63b02193cd34 VFS-9606 Disabled more QoS tests
Jakub Liput <jakub.liput@gmail.com> Jakub Liput <jakub.liput@gmail.com> 6daba3f8034234ee178554a5e8f4553069a60a33 VFS-9606 Fixed bamboo-spec
Jakub Liput <jakub.liput@gmail.com> Jakub Liput <jakub.liput@gmail.com> 08315f0a23c3afecb31513975651dfa2432b39ee VFS-9606 Disabled QoS tests

Configuration changes

Some of the jobs or stages referenced by this result no longer exist.

Jira issues

IssueDescriptionStatus
Unknown Issue TypeVFS-9606Could not obtain issue details from Jira