Acceptance tests using different clients concurrently. Environment deployed from packages.
Build: #275 failed Changes by Jakub Liput
Build result summary
Details
- Completed
- Queue duration
- 37 minutes
- Duration
- 41 minutes
- Labels
- None
- Revision
-
81a5311c34e9f3531df349343127ae94f10b929e
- Total tests
- 96
- Fixed in
- #294 (Manual run by Jakub Liput)
Tests
- 0 New failures
- 0 Existing failures
- 0 Fixed
- 6 Quarantined / skipped
Responsible
- Jakub Liput Automatically assigned
Code commits
Configuration changes
Some of the jobs or stages referenced by this result no longer exist.
Jira issues
Issue | Description | Status | |
---|---|---|---|
Unknown Issue Type | VFS-4807 | Could not obtain issue details from Jira |