None
Recent failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#45 |
Code changes detected
|
#46 |
Code changes detected
|
1 build 9 minutes |
#43 |
Manual run by Michał Stanisz
|
#44 |
Code changes detected
|
1 build 2 days, 19 hours, 3 minutes |
- Average time to fix a failure: 1 day, 9 hours, 36 minutes
- Average number of builds between fixes: 1 builds
- The longest time taken to fix a failure is 2 days, 19 hours, 3 minutes, from failure starting in build #43.
- The greatest number of builds taken to fix a failure is 1, from failure starting in build #43.